Walk in prepared.
Walk out clean.
F-tags are symptoms. The operational dysfunction underneath is what surveyors are really measuring — and what gets a facility cited a second time. We surface the pattern and rebuild the system before the next survey window.

Five disciplines that separate survey-ready facilities from the rest.
Mock Survey
Conducted with the same rigor as a State entry — including documentation review, observation, interviews, and an exit conference.
Documentation Audit
Sample-based audit against the State Operations Manual, not against internal expectations.
IDT Readiness Drill
Tabletop scenarios that surface communication breakdowns before surveyors do.
Plan of Correction Engineering
POCs the facility can actually sustain past day 90 — including measurement, owner, and audit cadence.
QAPI Integration
Survey findings linked directly into the QAPI committee so corrective work compounds rather than dissipates.
Survey-Week Coaching
On-call advisory during the actual survey window — entrance conference, ongoing observation, exit conference.
The best survey is one that wasn't surprising.
Bring AthenaCrest in 60–120 days ahead of the survey window for the cleanest possible outcome.
